JACIR carries out the complete and specific renovation of your concrete cooling towers
Thus, JACIR operates on:
Water distribution
Heavy industry application: replacement of the water distribution by a system of open stainless-steel channels, rapid control of clogging and simplified cleaning.
Drift eliminators
Replacement of the drift eliminators (installed between the channels for an easy maintenance) and setting up a fire extinguishing system.
AvantAprès
AvantAprès
Exchange surface
Replacement of the exchange body with the X-STREAM JACIR system (very high resistance to fouling (MES 400ppm) and very high mechanical resistance up to 30 kg/m²).
Renovation of 4 concrete cells of 50 m² each:
Consideration, by JACIR, of process downtime constraints: intervention carried out in record time.